Machinery Relocation for Large-Scale Industrial Projects

Planning, disassembly, transport, reassembly, and commissioning—all from a single source. HDAO GIGA Technology relocates individual machines, complete production lines, and entire plants on schedule, while bringing equipment from Asia up to European standards.

17+ years of experience

Specialized Company Under the Water Resources Act

Compliant with DGUV and UVV regulations

ISO-certified

Why Relocating Machinery Can Quickly Become a Cost Risk

Relocating a machine is not simply a matter of transport; it is a comprehensive technical project that stands or falls on its preparation. If the weight is merely estimated, the center of gravity is overlooked, or the floor load at the destination is not verified, the error will carry over into every subsequent phase. Suddenly, the crane is too small, the access road is too narrow, or the foundation hasn’t cured yet. The most costly aspect isn’t any single step in the process, but rather the unplanned production downtime that occurs when the equipment isn’t up and running on time at the new location.
When it comes to equipment from Asia, there is an additional layer of complexity. Upon relocation, delivered machines must be brought into compliance with CE standards, machine safety requirements, and applicable German and European regulations; furthermore, experience has shown that applications for heavy-haul transport and customs documentation for relocation abroad are often submitted too late. HDAO GIGA Technology is familiar with both markets and bridges precisely these gaps between Asian suppliers and European requirements, ensuring that a plant relocation does not result in downtime.

Machine Relocation as an End-to-End Process

We support your relocation throughout the entire process, from the initial assessment to the final acceptance and operation of the facility. As a general contractor, we bundle disassembly, equipment transport, reassembly, and commissioning into a single contractual agreement with a designated point of contact. Whether it’s an internal relocation of multiple systems, a domestic site move, or a production relocation to another European country: You’ll receive a coordinated schedule with clearly defined responsibilities, rather than individually coordinated trades.

The Service Components of Your Relocation

Planning & Assessment

We measure dimensions, weights, and the often tricky center of gravity, check gate heights, access roads, and floor load-bearing capacity at both locations, and obtain manufacturer documentation well in advance. In addition, we prepare a risk assessment and a robust schedule with buffer times.

Disassembly & Data Backup

Before shutting down the machine, we back up control data, program settings, and the parameters of the safety components. When dismantling the machine, we properly disconnect the electrical, hydraulic, and fluid lines and clearly label each line and assembly so that reassembly doesn’t turn into a guessing game.

Transport & Reassembly

We arrange heavy-haul transportation, crane services, and packaging; for exports, we ensure the shipment is seaworthy and provide corrosion protection for sensitive components. At the destination, we bring the machine inside, align it precisely, secure it in place, and reconnect all utility lines.

Coordination as a General Contractor

Don’t want to worry about the interfaces? We’ll handle all the coordination, manage all the individual trades, and provide you with a single point of contact from planning through final acceptance.

Here’s how HDAO GIGA Technology
safeguards your schedule and your system

A bridge between Asia and Europe.

We serve as a bridge between Chinese suppliers and European requirements—both technically and in terms of communication—and bring relocated equipment up to the required standards.

Expertise across the entire supply chain.

Project management, construction supervision, electricians, and installers are all in-house. This concentration of expertise prevents the typical communication gaps that occur between different trades.

Safety & Standards.

We serve as a consulting partner for CE and machine safety and conduct the required inspections in accordance with DGUV and VDE standards before the equipment is approved for use by employees.

17+

Years of experience

200+

Completed Projects

200.000+

Project Manager Hours

2.500.000+

Installation hours

up to 60

Current Projects

15+

Active in countries

Your Machine Relocation in Clear Steps

Assessment & Project Planning

Technical survey, infrastructure inspection at both locations, documentation, and risk assessment.

Preparation & Data Backup

Backing up control data and parameters; clearly labeling all parts, cables, and utility lines.

Disassembly

Properly disconnect the components and perform a visual inspection for wear-and-tear parts that should be replaced before reassembly.

Packaging & Transportation

Heavy-lift logistics, crane services, and specialized packaging for machinery relocation abroad, including timely customs clearance and transport permits.

Rebuilding & Alignment

Installation, leveling, anchoring, and reconnection of all utility lines at the destination.

Commissioning & Acceptance

Test runs, calibration, and fine-tuning, as well as the safety inspections required by law prior to approval.

Why Clients Choose HDAO GIGA Technology for Their Relocation

Everything from a single source

One general contractor, one contract, and one point of contact from planning through final acceptance.

Bridge Between Asia and Europe

We bridge the intercultural and technical gaps between Chinese suppliers and European standards.

Scalable Capacity

We can quickly expand project teams as part of our service offerings and respond flexibly to changing processes.

In-house expertise

Experience across the entire chain, from project management to field technicians.

Safe Transfer

CE, machine safety, DGUV, and VDE certified before the system is restarted.

Frequently Asked Questions About Machine Relocation

Cost drivers include the weight and center of gravity of the machines, the required lifting and transportation equipment, the infrastructure at both locations, and the scope of dismantling, data backup, and recommissioning. A thorough assessment at the outset is the most effective way to avoid unpleasant surprises later on.

The duration depends on the number and complexity of the systems. We plan the relocation as a project with milestones and buffer times, and schedule the steps so that downtime at the destination is kept as short as possible; if there are multiple systems, we also ensure partial operation.

Yes. We organize cross-border heavy-haul transport, handle customs clearance and permits well in advance, and ensure that the equipment complies with local standards at its destination. Bridging the gap between Asia and Europe is our core business.

Before approval, the legally required safety inspections—including those in accordance with DGUV and VDE—as well as functional tests and calibration must be completed. For systems imported from abroad, we also oversee CE compliance and machine safety.

Yes. A relocation is often the best time to perform a retrofit or a control system update, since the system is already dismantled. We’ll work with you to determine which upgrades can be included and incorporate them into the schedule.

Industrial installation that delivers on the schedule.

Your contact person
Sebastian Römer
Sales Manager

Are you planning a relocation, a plant move, or a shift in production?

We are your ideal partner at
.

Whether it’s mechanical and electrical installation as part of a team or taking on overall responsibility as a general contractor: Talk to us about your project. We’ll get back to you shortly.