Cleanrooms & Infrastructure
for semiconductor factories and data centers
Europe is expanding its semiconductor capacity to become less dependent on Asia, and alongside this, a second major construction project is taking shape with the AI data centers. Billions are being poured into new fabs and data centers. The key question is who is building them. HDAO GIGA Technology handles the physical implementation—both mechanical and electrical—in accordance with cleanroom and precision requirements, and with complete documentation.
Specialized Company Under the Water Resources Act
Design compliant with DGUV and UVV regulations
Operations in more than 15 countries
ISO-certified
Billions for chips and data centers—it all comes down to implementation
What We Do in the Semiconductor Industry
Installing Cleanrooms & Fab Infrastructure
Piping and Steel Construction for Factories and Data Centers
Position and Connect Production Equipment & Tools
Coordinate fab and data center projects as a general contractor
Manufactured to meet cleanroom and precision requirements
17+
Years of experience
2.500.000+
Installation hours
3,400 km
cables installed
32 km
installed piping
35,000+ metric tons
prefabricated steel structure
15+
Active in countries
Why HDAO GIGA Technology Is the Perfect Partner for the Semiconductor Industry
Manufactured to meet cleanroom and precision requirements
The highest cleanroom classes, low-vibration installation, and comprehensive documentation are part of the standard design—not part of the rework.
Experience with fab and data center infrastructure
Installation of cleanrooms, utility systems, and large-scale electrical and cooling infrastructure, both mechanical and electrical.
In-house Piping, Steel Construction, and Assembly
High-purity piping, steel fabrication, and installation are all provided by a single source, which reduces the number of interfaces and ensures consistent precision throughout the process.
Bridge Between Asia and Europe
When fab technology and teams from Asia come to Europe, HDAO GIGA Technology brings them up to European standards and makes the ramp-up feasible.
Equipped for Large-Scale Projects & Public Bids
Frequently Asked Questions About the Semiconductor Industry
Does HDAO GIGA Technology build cleanrooms and infrastructure for semiconductor factories?
Yes. GIGA handles the mechanical and electrical installation of cleanrooms, utility systems, and fab infrastructure in accordance with the cleanliness and precision requirements of semiconductor manufacturing. Upon request, we can serve as the general contractor for the project.
Does HDAO GIGA Technology also handle the expansion of data centers?
Yes. Data centers require the same level of discipline when it comes to electrical, cooling, and cabling infrastructure on a large scale. GIGA installs and connects this infrastructure and, upon request, coordinates all trades.
Does HDAO GIGA Technology operate in accordance with cleanroom and precision requirements?
Yes. GIGA operates under the highest cleanroom standards, with low-vibration installations, appropriate materials, and a process that verifiably documents every step.
Does HDAO GIGA Technology position and connect production equipment and tools?
Yes. GIGA installs equipment and tools with millimeter precision and minimal vibration, connects them, and relocates them as needed—even during expansions while the system is in operation.
Will HDAO GIGA Technology bring Asian fab technology up to European standards?
Yes. When technology and teams from Asia come to Europe, GIGA ensures that the systems comply with European and German regulations and bridges the gap between different working methods.
Is HDAO GIGA Technology prepared for public tenders?
Yes. GIGA is equipped to handle large, coordination-intensive projects and has the structure and experience needed for public tenders.
Your partner for large-scale projects.
Discuss Your Fab or Data Center Project
We build to the highest standards.
Are you planning a semiconductor factory, a data center, or an expansion, and need a partner who can execute the project cleanly and on schedule while meeting cleanroom and precision requirements? Talk to us.





